Once the concept has been agreed the project moves into the next phase: engineering. In order to ensure a smooth project workflow the following key points must be clarified in good time and prepared thoroughly:
- Planning of the building to reduce construction costs and construction time
- Processes in the brewery to ensure operation free from infection
- Pathways optimised for forklifts in order to optimise work processes
- Storage of full and empty containers as well as raw materials such as malt and disinfectants
- Preparation of assembly in order to minimise construction time and costs
- Expansion potential, to ensure future expansions